Viewing the construction from the northern corner
The entire frame work is clad in 12mm structural ply.
The ply acts as a bracing method, first and foremost. It is creating a structural surface for the sisalation to rest apon, as the construction time is extended longer than normal.
With the ply in place it will be regarded as being to lockup stage with out the need to clad the outside with the foamular.